Showing posts with label Royal Australian Navy. Show all posts
Showing posts with label Royal Australian Navy. Show all posts

Wednesday, 27 August 2014

Japanese submarine experts visit Adelaide, sparking fears for shipbuilding future

The South Australian Government wants an explanation from Canberra about the visit of Japanese submarine experts to Adelaide.
 
The group toured shipbuilding company ASC's base in Osborne yesterday, heightening fears the Federal Government may build the next generation of submarines overseas.
 
South Australian Defence Industries Minister Martin Hamilton-Smith said he knew nothing of the trip.
 
Mr Hamilton-Smith said he wanted answers about the reason behind the Japanese visit and whether it signalled a backdown from the Coalition's election promise to build the submarines in Adelaide.
 
"I think the Coalition could explain why this visit's been held in such secrecy," Mr Hamilton-Smith said.
 
"Who's in the party, is it senior military officials from Japan or defence department officials, is it at the political level?"
 
The Government has been looking at its policy for replacing its ageing fleet of Collins Class submarines including using Japanese technology, which has created uncertainty over how much work will be carried out in Australia.
 
The Coalition is due to reveal its policy for replacing the submarines next year with speculation Defence Minister David Johnston will reveal a significant downgrade in plans to build the 12 submarines in Adelaide.
 
Mr Hamilton-Smith said he was urgently seeking an explanation from Canberra.
 
"There's been speculation in the press about a submarine being built overseas, there's been quite a lot of criticism of the Australian shipbuilding industry, some of it unfounded," he said.
 
"I think the South Australian and Australian people involved in the defence industry deserve some answers."

Federal Government says it is business as usual


The Federal Government this morning confirmed 16 Japanese defence experts had toured ASC to look at naval and submarine technology.
 
Senator Johnston said the Government was considering a range of options but would not say what Japanese involvement there could be in the new submarine project.
 
He said Australia recently signed a defence science and technology agreement with Japan and the tour of ASC was linked to that.
 
"They're down here looking at defence science and technology and we are discussing ways whereby we may both collaborate in that space to the mutual advantage of both of our countries," he said.
Senator Johnston defended not alerting the South Australian Government to the visit.
 
"We don't routinely advise state governments of every hourly, weekly visit by defence, science personnel from around Australia or from overseas," he said.
 
"Defence is a Federal Government responsibility. As soon as we have a viable, feasible submarine plan we will announce that much, but having 16 Japanese technicians in South Australia is neither here nor there and quite frankly, is just simply business as usual."
 
The Minister said there would be an announcement either later this year or early next year as to the options the Federal Government would pursue to replace the Collins Class submarines.
 
But SA Premier Jay Weatherill accused the Federal Government of snubbing the SA community.
 
He said Federal Liberal MPs from SA should be working harder to ensure submarines were built in Adelaide, just as Liberal members serving with former prime minister John Howard had done for the successful Air Warfare Destroyer project.
 
"The reason we won that contract is because we had powerful voices in the federal Cabinet, like Nick Minchin, Robert Hill, Amanda Vanstone and Alexander Downer, who stood up and advocated for SA," Mr Weatherill said.

Shipbuilders head to Canberra


John Camillo from the Australian Manufacturing Workers Union said there were real fears for the future of shipbuilding in Adelaide.
 
"Not long ago the Federal Minister Johnston in Adelaide indicated that 12 new submarines will be built at the ASC," Mr Camillo said.
 
"And all of a sudden now the tone has been changed from the Government.
 
"It's a major concern for our members and their families."
 
The AMWU said a delegation of shipbuilders from around Australia will meet in Canberra today to call on the Government to commit to its election promise.
 
National secretary Paul Bastian said thousands of jobs would be lost if Australia imported submarines from Japan.
 
"As well as destroying jobs and industry, the Government is risking our national security with this reckless move," Mr Bastian said.

Saturday, 23 August 2014

Australia's military innovation to be driven by Tasmanian maritime college

Tasmania will be the home of a new training centre for highly qualified Navy engineers, as Australia embarks on a multi-billion dollar naval shipbuilding program.
 
The Training Centre for Transforming Australia's Naval Manufacturing Industry will be based at the University of Tasmania's Australian Maritime College in Launceston.
 
It will partner with the University of Wollongong and Flinders University to train 10 PhD students and 3 postdoctoral fellows to drive the research and development required by the Defence Force.
The project's lead investigator Jon Binns says the Research Training Centre will focus on naval design and manufacturing.
 
"We have focus somewhat around the future submarines, future frigates and patrol boat programs but this is transferable technology that they'll be developing," he said.
 
"For example in the sustainment area we're looking at trying to integrate how you monitor navy boats and integrate that back into the design so that we should be able to get boats that perform better and longer."
 
Australian Maritime College Principal, Professor Neil Bose, says the project will have far-reaching outcomes.
 
"It includes the training and career advancement of highly qualified engineers needed to support the design and manufacture of the SEA1000 future submarines, whose [sic.] construction alone will be Australia's largest engineering project," he said.
 
Peter Rathjen from UTAS says the engineering and research students will work on year-long projects, which will be developed in partnership with industry and defence.
 
"The crux of this scheme is that our students will get the opportunity to get industry placements and that that will help them to develop more relevant skills," he said.
 
Bass MP Andrew Nikolic says the funding for the $3.8 million naval centre has come from the Australian Research Council and industry groups.
 
"Some of the biggest projects in the defence force over the next 20 to 30 years will be maritime projects," he said.
 
Brian Yates from the Australian Research Council hopes the new centre will lead to more innovation in the defence force.
 
"The people that will be trained through this centre will have that high level of skills that will help that industry be competitive both nationally and internationally," he said.

Students start their work at the centre in December.

Wednesday, 20 August 2014

‘Fast-track frigates to save jobs’

A PLAN to save Australia’s ship building industry by bringing forward construction of eight potent new frigates for the Royal Australian Navy is being considered by the Abbott government. 
              
This option to bridge the so-called “valley of death” for shipbuilding would mean constructing sections of some of the new frigates when the hulls of the three air warfare destroyers (AWDs) are completed. That would mean the 7000-tonne frigates would use the same hulls as the destroyers so that they could be built with the existing equipment and the same workforce.
 
The sections, or “blocks” can be built in different shipyards and then welded together.
 
This option will be discussed in a speech to be made by Defence Minister David Johnston to key defence industry figures in Canberra today.
 
The valley of death is the tag given to the point when current defence contracts run out with the completion of the AWDs and two giant landing ships. Companies say they will have to sack thousands of skilled workers unless more ships are ordered.
 
That follow’s last night’s warning by Royal Australian Air Force chief Geoff Brown that the world was entering a period of political and economic instability “which will shape a potentially volatile and dangerous security environment, especially in our region”.
 
“Of particular concern to Australia is the rising tension in the South China Sea where our vital interests are directly engaged,” Air Marshal Brown told The Australian Strategic Policy Institute.
 
He said air power was the most agile and responsive military instrument available to government.
The use of air power by the US to save refugees trapped on Iraq’s Mount Sinjar had demonstrated how decisive it could be.
 
Senator Johnston will tell the industry representatives today the AWD project is running 21 months late and more than $360 million over budget.
 
He stresses the option of building the frigates in Australia ­depends on the shipbuilding industry demonstrating that it can complete the destroyers without further cost overruns or delays.
 
“This is to ensure everything is in place to allow a continued naval shipbuilding industry in Australia,” he will tell the Australian Business Defence Industry Group.
 
“All we are asking is that industry demonstrates it can meet an acceptable benchmark for cost and productivity.
 
“Part of the work on the future frigate program is to examine whether we can commit to the construction of some early blocks to ensure there is no break in production overall.”
 
Senator Johnston says no decision has been made on the design of the navy’s new submarines but work is progressing well on ­options. The government has ­already provided $78m for preliminary work on the new frigates.
 
The new class was set out in the Rudd government’s 2009 defence white paper which intended they’d be operational by the mid-2020s.
 
The ships were to carry cruise missiles and they were likely to be equipped with a system able to ­destroy ballistic missiles.
 
Co-operation on such a system was announced in Sydney last week at the annual AUSMIN talks between Australia’s foreign affairs and defence ministers and their US counterparts.

Tuesday, 19 August 2014

NUSHIP CANBERRA embarks on final trials

The ship departed Williamstown shipyard on 12 August as planned with the trials taking place in both Port Phillip Bay and off the southern coast of New South Wales before returning to Williamstown around the end of August.
 
Final contractor trials involve testing of the combat and communication systems along with some platform systems trials.
 
Director of BAE Systems Maritime, Bill Saltzer, said:  “This is the last major element of a very complex and comprehensive test program to prove the capabilities of the ship and its systems prior to delivery to our customer.
 
“Getting this ship to this stage has been a collaborative effort between BAE Systems and the Defence Materiel Organisation (DMO). Our two project teams have worked closely throughout the project and now we are in the home stretch for the CANBERRA.”
 
Aboard NUSHIP CANBERRA for the final contractor trials are BAE Systems and DMO project personnel along with a number of Royal Australian Navy (RAN) officers and sailors who will crew the ship once delivered, as well as BAE Systems subcontractors Navantia, Saab, L3 and Teekay.
 
The final trials also provide an ideal opportunity for a number of the crew to familiarise themselves with the ship following their training at the BAE Systems facility at Mascot, NSW, in which state-of-the-art simulation technology was developed and utilised to achieve technical competence in a cost-effective environment.
 
As well as demonstrating the ship’s capabilities, the trials will provide the team with valuable feedback regarding the effectiveness of the training program.  The utilisation and extent of virtual training within LHD has been a new approach for the RAN and the feedback received from the crew so far has been very positive.
 
Mr Saltzer said work was also progressing well on NUSHIP CANBERRA’s sister ship, NUSHIP ADELAIDE: “In shipbuilding, there are always lessons learned on the first ship of a new class that can be implemented to achieve higher levels of productivity on the following ship or ships and this is certainly the case with NUSHIP ADELAIDE. The second LHD is coming together rapidly and is on track to be ready to start sea trials in the second quarter of next year.”
 
The 27,000 tonne LHDs are the largest ships ever built for the ADF and will be operated by the RAN. BAE Systems is the Prime Contractor for the project. The main subcontractors are Navantia for the platform design and hull construction in Spain, SAAB as the combat system integrator and L3 for the internal and external communications systems.

Tuesday, 12 August 2014

Navy ship HMAS Bundaberg goes up in flames in Brisbane's east


 
A large navy ship fire east of Brisbane has been brought under control after three hours.
 
Firefighters in breathing apparatus remain at a commercial boat shed on Barku Court in Hemmant, about 11 kilometres east of the CBD. Earlier, about 50 firefighers and 16 fire trucks were called to the scene.
 
Authorities have confirmed the ship on fire is the HMAS Bundaberg, a navy vessel that was in Brisbane for routine maintenance.
 
Fire crews were called to the shipyards on the Brisbane River at 11.52am after an automated alarm went off.

Initial reports were that a 70-foot boat was ablaze, however the HMAS Bundaberg is much larger.
The Armidale-class patrol boat is about 56 metres long and was commissioned in 2007.
According to the Navy website, the HMAS Bundaberg (II) and 13 sister vessels are used for fisheries protection, immigration, customs and drug law enforcement operations

"Defence understands that at least two civilian contractors suffered smoke inhalation and were treated at the scene," A Defence spokesman said in a statement.

"No members of the Navy crew were injured in the incident. 
 
"The cause of the fire is not known at this time

"An assessment of damage and an investigation into the cause of the fire will be undertaken once it is safe to do so."

Then-Opposition Leader Tony Abbott on board the HMAS Bundaberg in 2012



 


 

Sunday, 10 August 2014

Australia extends Collins-class submarines maintenance contract with ASC

ASC has been awarded a contract extension to provide maintenance on the Royal Australian Navy's (RAN) Collins-class submarine fleet.
 
The company will continue to perform all maintenance work at its headquarters in Osborne, Adelaide, South Australia, and Henderson, Western Australia.
 
ASC interim chief executive officer Stuart Whiley said: "This new contract recognises the significant improvement in performance and availability of the submarine fleet.
 
"ASC already performs significant submarine maintenance work and inventory management at its facilities at Henderson in Western Australia, to complement its maintenance, engineering and logistics capabilities in South Australia.
 
"ASC plans to build on its capability in Western Australia to perform all mid-cycle and intermediate maintenance work, enabling the focus in South Australia to be on the new two-year full cycle docking (FCD)."
 
The new phase of the in-service support contract (ISSC) represents ASC's significant work undertaken to improve availability and reliability of the fleet, and its submarine enterprise partners, including the Defence Materiel Organisation (DMO) and RAN.
 
The new support initiatives that have been included are the introduction of a circumferential hull, cut for easy access to the submarine, and efficient removal of the diesel engines.
 
Also included are the construction of a new maintenance support tower at ASC's South Australian facility, house key resources forfacilities around the boat, remediation of the supply chain, and the establishment of a rotable pool of spare parts.
 
The navy currently operates a fleet of six 78m-long Australian Submarine Corporation-built Collins-class submarines, which are designed to carry up to 22 missiles and torpedoes, as well as six 533mm forward-torpedo tubes with air-turbine pump discharge.

Wednesday, 5 March 2014

Australian - Navy frustrated over faulty fleet

Navy chief Ray Griggs has revealed that he is frustrated by his faulty fleet of patrol boats and admitted he cannot provide as many ships as he would like to Operation Sovereign Borders.


 In a rare public comment on the secretive issue of border protection, Vice-Admiral Griggs conceded there was a design fault across the navy’s 14 Armidale class patrol boats, which had confined many of them to port for urgent repairs.


 The operation was dealt a blow, with the discovery late last month of serious structural cracks in the patrol boat fleet, which made them unseaworthy in rough seas.

Wednesday, 16 October 2013

An evolved Collins Class submarine is the leading option for Australia's next generation of submarines, Defence Minister David Johnston has revealed, renewing hopes that the final decision on the project will deliver jobs and investment in South Australia. 
              
Senator Johnston said in Adelaide yesterday that he believed an evolved Collins Class was a better choice than completely redesigning and building a new submarine.
 
Twelve next-generation submarines will be built under the SEA 1000 project, which has an estimated cost of up to $40 billion.
 
"Our experience is that to go down that path is quite problematic," said Senator Johnston, who was attending a Submarine Institute of Australia conference.
 
"The evolved Collins is the leading option … capitalising on our evolving corporate knowledge, so we will see what the department has done and what the plan is within the next month."
 
SA Defence Teaming Centre chief executive officer Chris Burns saying if this option was backed it would mean jobs and investment for the state.
 
"The centre for excellence of knowledge and capability about Collins is here in South Australia, so it further cements that the future submarines will be made here in SA," Mr Burns said.
 
"And an evolution of Collins means work will be able to commence sooner rather than later in terms of design."
 
The new Abbott government had said it would make a decision about the Future Submarine project within 18 months of taking office, along with creating a new defence white paper.
 
Senator Johnston said he intended pushing forward with "not a briefing but a seminar" over the future subs next month after returning from NATO meetings, to discuss what he described as the Federal Government's "number one priority at the moment".
 
Previously, the former Labor government had narrowed the Future Submarine decision to two main options for the new submarines - the evolved Collins boat or an entirely new Australian-designed and built option.
 
Both parties have committed to the submarines being assembled in South Australia.
 
Senator Johnston also said yesterday that he was confident there would be no gap in capability between the ageing Collins submarines being replaced.
 
"These subs are so important that time is of the essence," he said.
 
"The plan is coming together and you will hopefully shortly see exactly what we are doing with Collins, you will see the path that we are going to choose will be a middle path for SEA 1000 (future submarines)."
 
He said it was "the most important capability we've got at the moment".
 
But he also said that of equal priority was focusing on the sustainment and remediation of the existing six Collins class subs because "the life extension program is vital to the haste with which we must pursue the new boat".
 
"The submarine life extension program will allow an orderly transition to the new submarine without a capability gap but that's not to say we are slowing down SEA 1000 in any shape of form it just means there's a little more time," he said.
 

Wednesday, 3 July 2013

Australian destroyer's final keel block in place

The final keel block of Australia's first-of-class air warfare destroyers has been lifted into place in preparation for hull consolidation next year.

"This particular block will house flotation and stabilization equipment for the Hobart and will now be consolidated into the existing ship structure to complete the keel," Minister for Defense Materiel Dr. Mike Kelly said.

"The keel is the main structural element stretching along the center line of the bottom of a ship from the bow to the stern. The keel blocks will contain part of the Vertical Launch System, the diesel and gas turbine main engine rooms, auxiliary engine rooms, ballast tanks, propeller shafts and sonar equipment."

Work on the destroyer is taking place at the ASC Pty Ltd. shipyard in Adelaide. ASC is part of the AWD Alliance, formed with the government's Defense Materiel Organization and systems integrator Raytheon Australia.

Consolidation of the hull of the Hobart is expected to be completed by early next year.

Each Hobart-class destroyer will have 48 missile cells -- each cell able to be armed with either a single Standard Missile 2, or four Evolved Sea Sparrow missiles.

"The Hobart Class destroyers will provide the Royal Australian Navy with the most capable warships they have ever operated, with a sophisticated range of both offensive and defensive weapons," Kelly said.

Australia is building three Hobart-class AWD ships.

Tuesday, 2 July 2013

Australia Sells Amphibs for Scrap

The Royal Australian Navy’s two Kanimbla class amphibious ships have been sold to a US company for scrap, Minister for Defence Materiel Dr. Mike Kelly announced this week.

Southern Metals LLC, based in New Orleans, concluded the deal with the Australian government May 20, and it was made public by the Australian minister June 24. The selling price was undisclosed due to “commercial in confidence” considerations.

The two vessels, Kanimbla and Manoora, have been languishing in Sydney Harbour since being decommissioned in 2011. A Request for Tender was released to domestic and international markets for their disposal for recycling in June 2012. Earlier plans to sell the hulks as dive wrecks were abandoned following fears of public backlash.

“The disposal of Manoora and Kanimbla by sale has been completed in less than two years from the date the vessels were withdrawn from service, providing the best and most competitive net disposal cost to the commonwealth,” Kelly said.

Disposal of the two ships is subject to US government ITAR restrictions. They will be recycled in accordance with Australia’s environmental standards by 2014.

Kanimbla and Manoora are ex-US Navy Newport class LPDs, purchased in 1994 and locally modified for use by the Royal Australian Navy. In September 2010, the ships were the subject of an operational pause following age-related seaworthiness concerns. As a result, Manoora was prematurely decommissioned in May 2011 and Kanimbla in November of the same year.

Their amphibious capability is being replaced by existing vessels in the interim but will be filled from 2015 with the introduction of the RANs, two 27,000-ton Landing Helicopter Dock ships currently under construction.

Friday, 17 May 2013

ThyssenKrupp Submarine Unit Wins Access to Australia Bid

ThyssenKrupp AG (TKA) secured the chance to help develop a submarine for Australia after the country signed an agreement with Sweden’s government clearing the way for the involvement of the company’s Kockums AB unit. 

The accord gives Australia the right to use Swedish intellectual property for submarine design and technology, the Canberra-based Department of Defence said in a statement. The deal was necessary to begin working with Kockums, it said. 

Australian authorities have been exploring replacement of six Collins Class submarines, which were based on a Kockums design. The government said on May 3 that it’s proceeding with the project, dubbed SEA 1000, to assemble 12 of the vessels domestically and narrowed options to a new design or building an evolved version of the Collins configuration, with an off-the-shelf purchase discarded. 

“This agreement will pave the way for Swedish involvement in Australia’s future submarine program,” Defense Minister Stephen Smith said in today’s statement. “The ability for Australia to utilize Swedish submarine technology is a critical element, not only of the work on the Future Submarine Program but also in addressing the continuing challenges with the maintenance and sustainment of the Collins Class fleet.” 

HMAS Collins, the lead submarine, was commissioned in 1996. The last of the current six vessels isn’t scheduled to be retired until about 2031, after entering service in 2003. 

ThyssenKrupp doesn’t break out figures for Kockums. A spokeswoman at the Essen, Germany-based parent company wasn’t immediately available to comment. 

Kockums was part of ThyssenKrupp’s marine-systems business, which generated 3 percent of group sales at the steelmaker in the year through Sept. 30. The newly combined marine-systems and plant-technology division, dubbed industrial solutions, accounted for 15 percent of ThyssenKrupp’s revenue in the fiscal first half ended March 31.

Tuesday, 14 May 2013

Australian military, industry meet over problem projects

Senior Australian defense officials and heads of Australian defense companies have met over troubled defense projects.

Australian Minister for Defense Materiel Mike Kelly said progress made in remediation plans for each of six problem programs on the Projects of Concern list since a meeting was held in November were looked at.

"We are seeing tangible benefits in having government, (Department of) Defense and industry representatives discussing issues together and working towards remediation of these troubled projects," Kelly said. "Ultimately, results from these summits will deliver real benefits to the men and women of the Australian Defense Force."

The six projects involve Collins class submarines, a multi-role tanker aircraft, a multi-role helicopter, a redevelopment effort, direct fire support weapons and electronic support measures upgrade for maritime patrol planes.

The Australian Department of Defense said that since last November two projects were removed from the list but two others added.

All parties are said to be working together to achieve the main aim of the Projects of Concern process in putting the projects back on track and removed from the list.

The bi-annual face-to-face meetings have been held since 2011. A total of 21 projects have been put on the list with 15 removed -- 13 due to remediation and two due to cancellation.

Saturday, 11 May 2013

Exclusive - Inside HMAS Canberra

On the bridge wing of the navy's newest and biggest ever warship, HMAS Canberra, the vast scale of the amphibious assault ship is dramatic and stark. 
 
With Melbourne city silhouetted across a shimmering Port Phillip Bay, the ship's expansive 32-metre wide flight deck stretches for 203 metres as pleasure yachts bob at their moorings more than 30 metres below.

Such is the sheer size of HMAS Canberra that the antennae on top of the ship's stern mast will touch the deck of the Sydney Harbour Bridge.

This Canberra is known as a Landing Helicopter Dock (LHD) and she dwarfs anything else in the Royal Australian Navy fleet. She is the first of a $3 billion two-ship build. The second, HMAS Adelaide, will arrive early next year.

It is Australian engineering and technical expertise at the BAE Systems' Williamstown shipyard that is putting the finishing touches on vessels that will alter the nation's power projection capabilities forever.

 Navy Captain Craig Bourke is a fierce advocate for a project that he manages on behalf of taxpayers via his job with the Defence Materiel Organisation.
Such is the sheer size of HMAS Canberra that the antennae on top of the ship's stern mast will touch the deck of the Sydney Harbour Bridge. Picture: David Caird
From the moment News Limited begins the first ever media tour of Nuship Canberra, Captain Bourke is a mine of information. His enthusiasm for the ships and the project is infectious and his praise for the BAE Systems workforce, including 200 technical staff still beavering away in the ship each day, is effusive.

Given past problems with central keel blocks for the new Air Warfare Destroyers built at the facility, the gaggle of nervous BAE executives following along is understandable, but there is no aspect of the LHD project that Captain Bourke leaves untouched.

From the unique and precise welding systems employed to construct the seven superstructure modules and the exact tolerances employed to ensure that all 112 modules from around the nation and around the globe fit together senselessly, to the quality of the accommodation for "embarked forces" and the high-tech ovens in the ship's bakery, this is a project manager who knows his stuff.

Ship Safety Officer Mark Carter takes in the best view of Melbourne's CBD from the top of the 'aircraft take off ski jump' at the bow of the ship. Picture: David Caird
He is very proud that the build is running on time and on-budget and he is supremely confident that the ship will pass its sea trials later this year with flying colours and be in the navy's Order of Battle on schedule by the first quarter of 2014.

The first Commanding Officer of HMAS Canberra is Captain Jonathan Sadleir. The former Canadian officer has 27 years experience including 12 in the Canadian Navy. His last command job was driving the 3600-tonne Anzac frigate HMAS Parramatta.

As he surveys Port Phillip Bay from what will soon become his new office, dodging some of the 760km of cables being installed in the ship and the technicians doing the work, Captain Sadleir describes his new role as "humbling, but hugely exciting".

However, the excitement of commanding a ship more than eight times the size of his previous vessel is tempered by the responsibility of being the first CO of his adopted country's biggest ever warship and her 360-strong crew. For the first time a ship's crew will include up to 60 army and air force personnel, as well as 300 sailors.
The ship's expansive 32-metre wide flight deck stretches for 203 metres as pleasure yachts bob at their moorings more than 30 metres below. Picture: David Caird 
Captain Sadleir says that having the levers of the nation's first truly global military capability is a huge honour.

"This is an amazing self-sufficient capability, but our biggest challenge will be understanding just what we can do with it," he says.

Navy doctrine will change significantly with the arrival of the two LHDs and three Adelaide-built Hobart Class Air Warfare Destroyers, the most lethal warships ever to serve in the RAN.

The two amphibious assault ships and the AWDs will be home ported at Garden Island in Sydney, but the big ships will spend a great deal of time operating with the 2nd Battalion Royal Australian regiment out of Townsville or representing the nation around the region or the world.
Crew members, AS Roma Scheepers, PO Steven Firkin, Ships Capt. Jonathan Sadleir, Commander Dave Walter and CPO James Dew on the top flight deck. Picture: David Caird 
Being able to carry up to 1600 fully equipped combat troops (1000 comfortably), 110 trucks and vehicles and up to a dozen Abrams main battle tanks, not to mention 16 helicopters including Chinook heavy lift machines and Tiger attack helicopters and thousands of tonnes of humanitarian aid, gives the government previously unimaginable power projection capability.

Like all crew members, Captain Sadleir and Chief Engineer Commander Dave Walter have spent a lot of time training on simulators at HMAS Watson and at Mascot in Sydney learning how to operate the vessel. Simulation technology has become so refined that sailors can virtually step out of the land-based sim, on to the ship and start working.

In terms of capability and technology, the Canberra represents a quantum leap for the RAN. For example she has 65,000 control and monitoring points compared to just 1500 on an Anzac frigate and the vessel is fitted with more water tight doors than the entire eight-ship Anzac frigate fleet combined.

The hull and vehicle, aircraft, flight and accommodation decks and machinery spaces were all built in Spain, but the four modules that contain the "brains" of the ship were constructed in Newcastle, Perth and at Williamstown where they are being installed at BAE's shipyard.
In terms of capability and technology, the Canberra represents a quantum leap for the RAN. Picture: David Caird
This includes the bridge, operations rooms including the deployable joint force headquarters, command and control rooms, communications and combat systems. All the sensitive areas of the ship are encased in 25mm thick ballistic steel and the bridge is built from the same alloy used to protect the Abrams main battle tank.

Wherever soldiers will be moving around the ship passageways are extra wide with built in slides for packs to be moved between decks. The light vehicle deck, where Bushmaster infantry vehicles, light trucks and Land Rovers will be stored covers a massive 2400 square metres and can handle a maximum load of 611 tonnes. It includes workshop facilities on each side that will enable virtually any maintenance task to be undertaken in-house.

Vehicles can be moved between decks via a ramp on the port (left) side or a light vehicle elevator. There are also two aircraft elevators, two personnel elevators, an ammunition elevator and a hospital elevator running between the decks.

Between the light vehicle and heavy vehicle decks are the accommodation, recreation and living spaces as well as the 40-bed hospital fitted with two operating theatres, intensive care unit and X-ray room as well as mess decks, galleys and office spaces.
HMAS Canberra is the first of a $3 billion two-ship build. The second, HMAS Adelaide, will arrive early next year. Picture: David Caird
There are two internet cafes and two gyms and all recreation areas are equipped with satellite TV, internet and projectors and CCTV so they can double as briefing rooms.

The state-of-the-art central galley is huge and includes a bakery section to bake bread for 1500 people a day. Up to 25 chefs will work around the clock to dish up a maximum of 6000 meals a day using equipment that can cook 400 chicken breasts at once as well as enough meat sauce to feed 300 people.

The fourth deck down on the ship is the heavy-vehicle deck that covers 1400 square metres and can accommodate 196 shipping containers and a maximum load of 1524 tonnes. It is located forward of a 70m by 17m welldock that is flooded to allow four 24m-long landing craft and other boats to operate inside the ship.

The welldock, landing craft and helicopters mean that all troops, equipment and supplies can be landed without wharves or docking facilities.

The ship's gas turbine generator produces 19.5 megawatts of electricity and two diesel generators seven megawatts each, which is enough to power a city the size of Darwin.

The key challenge for Captain Bourke and the BAE Systems project team headed by Marcos Alfonso, will be a successful program of sea trials this spring followed by a seamless delivery to the Chief of Navy, Vice-Admiral Ray Griggs, before March 2014.

"We can do it provided we keep focused and stay on the ball and work together," Captain Bourke said.

HMAS CANBERRA/ HMAS ADELAIDE
* Amphibious assault ships
* 27,800 tonnes
* 230 metres long
* 32 metres wide
* 202 metre flight deck 28 metres above water
* 360 crew and up to 1600 troops
* 100 vehicles and 12 tanks
* 4 X 24 metre landing craft
* Internal well dock to load and unload craft
* 16 helicopters, six operating at once
* 40-bed hospital and two operating rooms
* Maximum speed above 20 knots (35km/hr)


HISTORY OF A NAME
The navy's biggest ever vessel will be third Royal Australian Navy ship to carry the name HMAS Canberra in honour of the national capital.

The first HMAS Canberra was a Kent Class heavy cruiser sunk by Japanese forces during the Battle of Savo Island in the dark days of WW2 in August 1942.

The following year the United States Navy commissioned the only ever ship to bear the name of a foreign capital city when the heavy cruiser USS Canberra was launched.

The second HMAS Canberra was an American built Adelaide Class guided missile frigate that served for 27 years from 1978 to 2005.

The ship became the first FFG to be decommissioned and she was scuttled off the Victorian coast in October 2009 to become a dive wreck.

The latest and biggest HMAS Canberra is due to be accepted into navy service by March 2014.

Friday, 26 April 2013

Australia to deploy warship to join U.S. fleet in Japan

Australia will deploy a guided- missile frigate, HMAS Sydney, to join the U.S. 7th Fleet in Japan at a time of heightened tensions on the Korean peninsula and in the South China Sea, according to The Australian on Friday.

The Australian said the warship will be "embedded" with a U.S. aircraft carrier strike group operating out of Yokosuka, but the Department of Defense didn't confirm the news so far.

HMAS Sydney is an Adelaide-class guided-missile frigate launched in 1980. It was sent to the Persian Gulf five times in support of U.S. operations during the Gulf War, in Afghanistan and Iraq.

According to the report, this mission has been long-planned to increase Australian Navy's experience at providing air defense for a fleet, in preparation for the arrival of the Navy's two massive landing ships and three air warfare destroyers.

"Australia has made it clear we stand shoulder to shoulder with the Republic of Korea, also with Japan," the report quoted Defense Minister Stephen Smith as saying.

And Peter Jennings, a former senior Defense official who now heads the Australian Strategic Policy Institute think tank, said the deployment was significant. "It does reflect a return to the type of co-operation that used to happen in the 1980s and 90s when we exercised more frequently with the Americans."

Tuesday, 16 April 2013

HMAS Choules returns to sea

HMAS Choules has returned to sea following sea assurance testing of the ship’s six propulsion and power distribution transformers which were replaced after a defect was identified in June 2012.

The ship then followed a graduated program of trials and training which concluded with a final successful readiness assessment on 12 April 2013.

Navy and the Defence Materiel Organisation have worked together to achieve this outcome. Air Force also assisted by transporting the transformers from Germany.

The ship will now participate in a number of minor amphibious exercises in North Queensland during May and June 2013 before joining other Navy ships in Exercise Talisman Sabre 13 off the Queensland coast.

The Navy’s amphibious force includes Choules, the Landing Ship Heavy HMAS Tobruk, Australian Defence Vessel Ocean Shield, and three Landing Craft Heavy vessels.

The first Landing Helicopter Dock, recently named NUSHIP Canberra, is due to achieve initial operating capability by the end of 2014.

Monday, 19 November 2012

Nuclear subs 'out of Aussie reach' says US Ambassador



Australia is a long way off being capable of running nuclear submarines, US Ambassador Jeffrey Bleich says. 

Some coalition frontbenchers are reported to have spoken to US officials about replacing the navy's diesel fleet with nuclear-powered submarines.

The coalition members apparently keen on the strategy are not named in the reports by Fairfax Media.

Mr Bleich says the idea surfaces every now and again, but it's not on the table in the immediate future.

"It's an idea to speculate about, but it's so far away from being a serious policy consideration,",
"Politically, there hasn't been a real momentum for development of a nuclear energy program at all, let alone nuclear submarines, in Australia."

Australia has in the past found it difficult to fins submarines that meet the needs of its navy. The range at which its submarines must operate make most traditional diesel-powered submarines unsuitable as they are generally built for the confined waters of Europe.

This is why Australia designed and built its own submarines, the Collins Class, in the 1990s.
Without necessary nuclear expertise and infrastructure in place, it would be difficult to maintain a defence program involving nuclear subs, the Ambassador said.

It was up to Australia, not the United States, to start any conversation about looking into alternative nuclear technologies.

But he said if Australia were to express interest in developing a nuclear program, the US would be open to dialogue.

US Defence Secretary Leon Panetta and Secretary of State Hillary Clinton will be in Perth this week for the annual Australia-US Ministerial (AUSMIN) talks.

Monday, 29 October 2012

Australia - Navy techical sailors lured by mine cash



A Shortage of technical sailors, blamed on the resources boom, has forced the navy to tie up two frontline warships indefinitely while its remaining 10 frigates lost 459 days in just six months this year due to "unscheduled" repairs and maintenance.

The navy describes the temporary withdrawal from service of the WA-based frigate HMAS Arunta and the Sydney-based HMAS Stuart as "extended readiness" and it blames the mining boom's high wages for cornering the market in highly qualified technicians.

Navy chief Vice Admiral Ray Griggs said it would take the senior service until 2018 or 2020 to recover from the shortage depending on what happened in the resource sector.

He said the impact of the loss of two frigates would be minimal because three of the ships would be out of service receiving an anti-ship missile upgrade.

"We still have a problem with technical sailors and retaining technical sailors," Admiral Griggs said.



"It is going to be a long-term thing to recover from."

Defence said the navy had been working on a number of initiatives to stabilise the technical workforce. This has included targeted retention bonuses, re-structuring of the fleet support units, industry outplacement programs and a focus on retention.

HMAS Anzac was out of service for about 35 days for "unscheduled maintenance", HMAS Sydney lost 28 days and HMAS Darwin 27 days.

"Sydney's scheduled docking maintenance availability was extended beyond the planned date due to a defect in the ship's main propulsion system identified during the scheduled maintenance period," a navy spokesman said. "During Darwin's scheduled maintenance period additional work was required to repair defects in the ship's gas turbine engine exhaust uptake system."

The navy said it has worked very hard during the past 14 months to better manage the competing demands of operational availability and maintenance requirements. Availability has also been a major challenge for the 14-vessel Armidale class patrol boat fleet during the first six months of this year when it lost 215 days due to unscheduled repairs and maintenance.

In addition to the well publicised gas leak and hull cracking problems, the navy has also highlighted issues with stern tube bearings and cooling, rigid hull inflatable boats and their davits and main engine fuel pumps.

"Despite reduced availability, the Armidale force has met all required operational tasking," the navy said.

Thursday, 4 October 2012

Elbit Systems to Supply Battle Management Systems for the Royal Australian Navy



Elbit Systems announced today that it was awarded a contract from the Australian Defence Force (ADF) for the supply of Battle Management Systems (BMS) for the Royal Australian Navy's landing craft. The contract is in an amount that is not material to Elbit Systems.
                         
Elbit Systems announced today that it was awarded a contract from the Australian Defence Force (ADF) for the supply of Battle Management Systems (BMS) for the Royal Australian Navy's landing craft. The contract is in an amount that is not material to Elbit Systems.
                         
The systems are to be integrated into landing craft installed on board the Canberra Class Amphibious ships (LHD). The watercraft will enable transport of troops and equipment from the LHDs to the shore including where there are no fixed port facilities and will allow communication and connectivity with the Infantry Forces in joint operations.
                         
Elbit Systems announced today that it was awarded a contract from the Australian Defence Force (ADF) for the supply of Battle Management Systems (BMS) for the Royal Australian Navy's landing craft. The contract is in an amount that is not material to Elbit Systems.

 Bezhalel (Butzi) Machlis, General Manager of Elbit Systems’ Land and C4I Division commented: “The fact that the Australian Defence Force, one of the most advanced and modern armies in the world, has decided to also equip its Navy with our Battle Management Systems, attests to its satisfaction with the quality and maturity of our systems". Machlis added: "This decision also reflects the need of world leading armies to enhance the connectivity and communication between their divisions, and we trust that additional customers will follow and select our advanced Battle Management Systems.”
                         
Elbit Systems announced today that it was awarded a contract from the Australian Defence Force (ADF) for the supply of Battle Management Systems (BMS) for the Royal Australian Navy's landing craft. The contract is in an amount that is not material to Elbit Systems.
Elbit Systems has been supplying its BMS to the Australian Army under the defence network-centric "Land 75/125" Program, one of the largest BMS programs in the world.
                         

The LHDs are 754.5 feet long and can carry a combined armed battlegroup of more than 1,000 personnel, 100 armored vehicles and 12 helicopters.

In Fall 2011 the Australian government has approved the purchase of 12 landing crafts from Spanish shipbuilder Navantia for the navy's Canberra class landing helicopter dock ships. The LCM-1E landing crafts are the same type used by the Spanish Navy. With a length of 23.3 meters and a breadth of 6.4 meters they can reach 20 knots and have a range of 190 miles.

Navantia, which has headquarters in Spain, is building the hulls for the LHDs and the medium-sized, fast landing craft will be purpose-built for these ships.